Welcome to visit the official website of Yixing Xingyi Special Transformer Co., Ltd.! The customer's peace of mind and satisfaction with each product is our lifelong pursuit. With our efforts, we will solve your troubles!
Banner
Home > news > Content

Talking about the preparations for the construction and installation of electric furnace transformers

The electric furnace transformer is an electrical equipment in electrical equipment, and it can stabilize the voltage and current in the circuit.

Construction and installation preparations:

(1) After discussing and determining the overhaul project, do a good job in the division of labor and implementation of the work. The workshop establishes a corresponding organization, which is specifically responsible for the maintenance work, the process group is responsible for the process plan and measures, and other teams help solve other maintenance tasks. Other personnel such as lifting, Trial coordination and solution.

(2) Make preparations for material supply in advance; required materials, spare parts, safety helmets should be worn when entering the substation, and seat belts should be fastened when working at high places.

Reinstallation of the electric furnace transformer: the work is completed and qualified, the opening of the cooler is completed, the iron core coil and the lower fuel tank are rinsed clean, check whether the work is missing, whether there are leftovers, etc., and check whether the maintenance tools are ready. It is possible to drop the bell, install the tap changer operating mechanism and high and low voltage bushings, install the upper air duct, oil conservator and no-load switch operating mechanism.

Before installation, repair the accessories of the electric furnace transformer, replace the gasket, silica gel, etc. The whole process of reassembly should be gently pulled and placed, so as not to cause damage.